# NAWA F2 modular compute cell

Canonical URL: https://nawapower.com/models
Markdown URL: https://nawapower.com/models.md

Explore NAWA F2: a modular compute cell pairing IT and power containers. See the design, cooling, electrical systems and deployment approach.

[All public pages](https://nawapower.com/llms.txt) · [Requirements and inquiries](https://nawapower.com/agents/inquiries.md) · [Website view](https://nawapower.com/models?mode=human)

## Context

Nawa Power develops modular GPU infrastructure around available power. These are partnership interests. Site acceptance, lease assumption, capacity, pricing, financing and delivery dates require diligence and written agreements.

## Page content

Two-box compute cell · F2 basis, September 2026

## One megawatt in two standard containers.

The deployable unit is a two-container cell in standard ISO boxes: an IT box carrying six NVL72-class racks with their fabric, and a power box carrying the switchboard and the UPS. The pair is tested together at the factory and re-joined on site with one busduct connection. It stacks from one cell to a campus, and the module set stays the same across geographies and voltage standards.

 

<a id="modules"></a>

NAWA F2

<a id="f2-mobile-1a6682b7-title"></a>

### The cell, part by part.

Compute, cooling and power. Built to work together.

Diagram: Compute racks highlighted within the clay F2 model.

Diagram: Wider clay site showing the F2 cell, power equipment and site connections.

Racks Concept

Select a part to take a closer look.

<a id="f2-mobile-1a6682b7-detail-racks"></a>

#### The compute inside.

Vera Rubin NVL72 racks sit inside the IT module. We coordinate the rack layout and integration with our silicon partners.

<a id="f2-mobile-1a6682b7-detail-cooling"></a>

#### Move heat out of the cell.

Liquid cooling carries heat from the chips to the roof equipment. Separate cooling supports the room and network hardware.

<a id="f2-mobile-1a6682b7-detail-power"></a>

#### Protect the supply.

The power module brings distribution, UPS protection and batteries together. Its connection to grid and backup sources is engineered for each site.

<a id="f2-mobile-1a6682b7-detail-network"></a>

#### Connect racks and workloads.

Network cabinets connect the compute inside each cell. Fiber links join the cells and carry traffic to the site’s carrier handoff.

<a id="f2-mobile-1a6682b7-detail-site"></a>

#### Bring the whole site together.

Foundations, power connections, fiber access and service clearances complete the deployment. Each site’s infrastructure sets the starting point.

Module by module

### What is in the box.

 

Diagram: NAWA F2, plan and elevation

Plan and elevation. F2 layout, September 2026. Not to dimension.

Hover to explore. Select a component to pull it out.

<a id="basis"></a>

Design basis

### The figures, and where each comes from.

 

Four cells on one pad. Design intent.

| Figure | Value | Source |
| --- | --- | --- |
| IT box | 40 ft ISO high-cube | F2 workbook: Decision status |
| Power box | 40 ft ISO, or 20 ft where cells never stack | F2 workbook: Decision status |
| Compute racks | 6, NVL72-class; 4 at entry | F2 workbook: Loadout menu |
| Accelerators | 432; 288 at entry | F2 workbook: Loadout menu |
| IT load | About 1,025 kW; 690 kW at entry | F2 workbook: Loadout menu |
| Facility load | 1.17 MW; 0.79 MW at entry | F2 workbook: Loadout menu |
| Air plant | 275 kW qualified, minimum | F2 workbook: Verification |
| Ride-through | 90 seconds | F2 workbook: Redundancy doctrine |
| Transformer on the pad | 1,500 kVA | F2 workbook: Verification |
| Campus of four cells | 1,728 GPUs, about 4.7 MW, 8 containers | F2 workbook: Campus math |
| Firm power to enter a site | 1.2 MW; 0.9 MW for the four-rack loadout | F2 workbook: Campus math; NAWA\_POD\_1M\_SPEC.md §11 |

The hardware for a modular data centre is now an industrial product with a supply chain behind it. The layer that holds the power agreement and the site, and operates the whitespace on them, is open. Nawa sits in that layer, and the module builders are its suppliers.

<a id="terms"></a>

Terms

### Four words on this page.

**CDU Coolant distribution unit**
Sits between the rack loop and the facility loop. It holds the water going to the chips at a set temperature and keeps the two loops separate.

**UPS Uninterruptible power supply**
Carries the load through a utility interruption long enough for the site to ride through or transfer.

**N+1 One spare beyond need**
A redundancy model. The system meets its rating with one unit out of service.

**Direct to chip Direct-to-chip liquid cooling**
Cold plates sit on the processors and carry heat away in water. Air handles what is left.

<a id="next"></a>

Next

### Put one on your power, or run on one.

[Get compute](https://nawapower.com/contact/compute) [Offer land or power](https://nawapower.com/how-it-works#power)

