San Francisco Bay Area

New substation headroom around the Bay is spoken for years out.

Capacity
5 MW
Power
Grid
Status
Power available
Deployment
Modular GPU infrastructure

Why this market

The position.

New substation headroom around the Bay is spoken for years out.

An energised service is the scarce thing.

Compute placed here sits inside the latency envelope that voice and interactive workloads need.

Power available

Where this stands.

Today

Energised and available, inside the Bay Area latency envelope.

Next

A yard on the pad, and a first offtaker.

Energised service, ready for deployment.

Configuration

What fits here.

Power in a 40 ft unit, compute and coolant distribution in the first 20 ft, heat rejection in the second. The three dock in line on one pad.

Open Yard 400

The rest of the portfolio

Five markets.

Where the power sits Dallas–Fort Worth, United States: 500 kW, Power available. San Francisco Bay Area, United States: 5 MW, Power available. Ankara region, Türkiye: Under study, Concept. Undisclosed, Kazakhstan: 100 MW, In development. North-west coast, Sri Lanka: 100 MW, In development. Undisclosed, United Arab Emirates: Under study, Concept. 500 kW 5 MW Under study 100 MW 100 MW Under study
  • United States 500 kW
  • United States 5 MW
  • Türkiye Under study
  • Kazakhstan 100 MW
  • Sri Lanka 100 MW
  • United Arab Emirates Under study