Tanzania · Concept
Dodoma
The Julius Nyerere hydropower station came online in 2025 with 2,115 MW of nameplate and about 720 MW of average output.
- Capacity
- Under study
- Power
- Hydro over the 400 kV grid
- Status
- Concept
Tanzania · Concept
The Julius Nyerere hydropower station came online in 2025 with 2,115 MW of nameplate and about 720 MW of average output.
Why this market
The plant sits inside a World Heritage property, so the load belongs elsewhere. Dodoma carries 310 MVA of transformation at 24 per cent utilisation with N-1. It sits at 1,100 m in a semi-arid climate and joined the 400 kV network in August 2026.
Concept
Nawa is studying Dodoma as the load node for a generation-side offtake from the plant.
A wheeling tariff across the state network, and an eligible-customer designation.
A region under study.
Configuration
The rest of the portfolio