Türkiye · Concept
Ankara region
Türkiye is drawing hyperscale investment on data-residency demand and a state incentive package for data centres.
- Capacity
- Under study
- Source
- Grid and renewables
- Stage
- Concept
Türkiye · Concept
Türkiye is drawing hyperscale investment on data-residency demand and a state incentive package for data centres.
Why this power exists
Türkiye is drawing hyperscale investment on data-residency demand and a state incentive package for data centres.
Installed generation runs near 115 GW.
The binding constraint is transmission: the renewables sit in the centre and the east, and the industrial load sits in the north-west.
Ankara sits between them.
Concept
Nawa is studying the region against the incentive regime and the transmission position.
A site, and a transmission study against it.
A region under study.
Configuration
A chilled-water hall drawn to a published reference topology, with the power and cooling plant built as modules and set on a prepared slab.
The rest of the portfolio
Next