Türkiye · Concept

Ankara region

Türkiye is drawing hyperscale investment on data-residency demand and a state incentive package for data centres.

Capacity
Under study
Source
Grid and renewables
Stage
Concept

Why this power exists

The position.

Türkiye is drawing hyperscale investment on data-residency demand and a state incentive package for data centres.

Installed generation runs near 115 GW.

The binding constraint is transmission: the renewables sit in the centre and the east, and the industrial load sits in the north-west.

Ankara sits between them.

Concept

Where this stands.

Today

Nawa is studying the region against the incentive regime and the transmission position.

Next

A site, and a transmission study against it.

A region under study.

Configuration

What fits here.

A chilled-water hall drawn to a published reference topology, with the power and cooling plant built as modules and set on a prepared slab.

Open Campus 7.5

The rest of the portfolio

Four countries.

Where the power sits North-west coast, Sri Lanka: 100 MW, In development. Undisclosed, Kazakhstan: 100 MW, In development. Ankara region, Türkiye: Under study, Concept. Dallas–Fort Worth, United States: 500 kW, Power available. San Francisco Bay Area, United States: 5 MW, Power available. 100 MW 100 MW Under study 500 kW 5 MW
  • Sri Lanka 100 MW
  • Kazakhstan 100 MW
  • Türkiye Under study
  • United States 500 kW
  • United States 5 MW

Next

Talk about this site.